What is the difference between a BMS and a BAS?
In practice there is none; both describe a system that monitors and controls building equipment from one platform. BMS is the common term in Saudi Arabia and the Gulf, BAS in North America.
A building management system (BMS) is a central control system that monitors and automatically runs a building’s equipment: HVAC, ventilation, pumps, lighting and meters, all on one set of screens with alarms and operating records. This guide explains how it works, what it is made of, and when your building needs one.
Free consultation and free site visit in Riyadh
It is also called a building automation system (BAS), and the two terms mean the same thing on most projects. Its job is to make building equipment run only when needed, at the right values, and to tell the operations team about any fault as it happens.
A BMS does not replace life-safety systems such as fire alarm and suppression. Those remain independent systems, and the BMS only monitors their status.
A BMS runs a continuous four-step cycle, repeated every few seconds for every piece of equipment in the building:
| Component | Role | Term |
|---|---|---|
| Sensors and meters | Measure room conditions and energy and water use | Sensors & Meters |
| Field controllers | Run the control logic for each plant item or zone | DDC Controllers |
| Actuators and drives | Move valves and dampers and set speeds | Actuators · VFD |
| Supervisory controller | Gathers the controllers and connects third-party systems | Supervisory Controller |
| Operator workstation | Graphics, alarms, trend logs and reports | Operator Workstation |
| Communication network | Connects the components over open protocols | BACnet · Modbus |
What we connect and how: building systems integration.
System components and equipment from different manufacturers talk over open communication protocols. That is what lets equipment from different makers work as one system, and keeps you free of any single manufacturer when you extend or maintain it.
A study for the US Department of Energy estimated that properly tuned controls in commercial buildings can save around 29% of energy use on average. The actual figure varies from building to building.
There is no fixed price per square metre; the cost is built on what the building actually needs. The main factors:
Accurate pricing starts from the IO list or the drawings. Send them to us and we reply with a clearly itemised quotation.
In practice there is none; both describe a system that monitors and controls building equipment from one platform. BMS is the common term in Saudi Arabia and the Gulf, BAS in North America.
SCADA is mostly used in industrial plants and distributed networks such as water and power, while a BMS is designed for building services such as HVAC, lighting and energy. Some functions, such as alarms and trend logs, are similar.
A point is each single reading or command the system handles: a temperature sensor reading is one point, a fan start command is another, and its running status is a third. The point count is the basis of BMS design and pricing.
Yes. Existing equipment is connected through new controllers, or through its communication protocol if it has one, and the work is phased so the building stays in operation.
Send us the drawings or the IO list, or call us directly. We review your project and reply with a clear quotation or the questions we need answered.