How long does BMS commissioning take?
It depends on the point count and how ready the site is. Testing goes faster when the field devices are installed and powered and the mechanical contractor is ready to run the equipment.
We take the building management system package from the IO schedule to a signed handover. Main contractors use us as their BMS subcontractor, and every stage ends with a document the consultant can review, so the project reaches handover with confidence.
Free consultation and free site visit in Riyadh
Air handling units, fan coil units, VAV boxes, chillers and chilled water pumps, cooling towers, exhaust and fresh air fans, VFDs, energy meters, lighting zones, water tanks and sump pumps, plus status from fire alarm, gas suppression and UPS systems. The final scope always comes from the project IO list.
It depends on the point count and how ready the site is. Testing goes faster when the field devices are installed and powered and the mechanical contractor is ready to run the equipment.
Yes. Most of our BMS work is a subcontract to the main or MEP contractor, with submittals and testing coordinated with the consultant.
The MEP drawings or the BMS IO list, the BMS specification and the project location.
Send us the drawings or the IO list, or call us directly. We review your project and reply with a clear quotation or the questions we need answered.